EVolution is a news, intelligence and analysis service dedicated to the emerging business of supporting electric and hydrogen-fuelled vehicles.

Crossrail moves forward with Canary Wharf station moving into next phase

25 February 2010
Sadiq Khan (left) switches on the pumps with Crossrail’s Rod Holden (right)
Sadiq Khan (left) switches on the pumps with Crossrail’s Rod Holden (right)

 

Transport minister Sadiq Khan last month helped move the construction of the new Crossrail station at Canary Wharf into its next phase with the switch on of pumps draining nearly 100 million litres of water from the construction site at West India Quay.

The pumps will transfer water from inside the site's specially constructed coffer dam to the North Dock at a maximum rate of 13,500 litres per minute over a six week period. The move will allow construction of the 260-metre-long station box the...

+26% more

 

Senior Transport Planner
London Borough of Camden
5 Pancras Square, London, N1C 4AG
£44,579
Senior Programme Development Officer
East Midlands Combined County Authority
Chesterfield / Hybrid
£36,648 - £41,418
Senior Programme Development Officer
East Midlands Combined County Authority
Chesterfield / Hybrid
£36,648 - £41,418
View all Vacancies
 
Search
 
 
 

TransportXtra is part of Landor LINKS

© 2024 TransportXtra | Landor LINKS Ltd | All Rights Reserved

Subscriptions, Magazines & Online Access Enquires
[Frequently Asked Questions]
Email: subs.ltt@landor.co.uk | Tel: +44 (0) 20 7091 7959

Shop & Accounts Enquires
Email: accounts@landor.co.uk | Tel: +44 (0) 20 7091 7855

Advertising Sales & Recruitment Enquires
Email: daniel@landor.co.uk | Tel: +44 (0) 20 7091 7861

Events & Conference Enquires
Email: conferences@landor.co.uk | Tel: +44 (0) 20 7091 7865

Press Releases & Editorial Enquires
Email: info@transportxtra.com | Tel: +44 (0) 20 7091 7875

Privacy Policy | Terms and Conditions | Advertise

Web design london by Brainiac Media 2020