EVolution is a news, intelligence and analysis service dedicated to the emerging business of supporting electric and hydrogen-fuelled vehicles.

Let’s explore smart solutions to free up more rail capacity

The national timetable is going from bad to worse, with no one responsible for securing good connections, capacity wasted on short trains and standard intervals being eroded.

Jonathan Tyler
14 October 2019
 

The capacity of any section of railway is only determined in part by physical characteristics such as the number of tracks, permitted speeds and the signalling. Equally important are decisions about the design of the timetable. A line where homogenous trains all run at the same speed and call at the same stations will have a greater effective capacity than one with similar infrastructure but more varied requirements – for example, non-stop and stopping trains. A random sequence with...

+94% more

 

Traffic Network Engineer
Portsmouth City Council
Portsmouth
£31,067 - £37,937
Transport Services Manager
Rutland County Council
Rutland
£54,976 - £58,977
Transport Services Manager
Rutland County Council
Rutland
£54,976 - £58,977
View all Vacancies
 
Search
 
 
 

TransportXtra is part of Landor LINKS

© 2024 TransportXtra | Landor LINKS Ltd | All Rights Reserved

Subscriptions, Magazines & Online Access Enquires
[Frequently Asked Questions]
Email: subs.ltt@landor.co.uk | Tel: +44 (0) 20 7091 7959

Shop & Accounts Enquires
Email: accounts@landor.co.uk | Tel: +44 (0) 20 7091 7855

Advertising Sales & Recruitment Enquires
Email: daniel@landor.co.uk | Tel: +44 (0) 20 7091 7861

Events & Conference Enquires
Email: conferences@landor.co.uk | Tel: +44 (0) 20 7091 7865

Press Releases & Editorial Enquires
Email: info@transportxtra.com | Tel: +44 (0) 20 7091 7875

Privacy Policy | Terms and Conditions | Advertise

Web design london by Brainiac Media 2020