The Metrocentre Gateshead shopping centre in Tyneside has announced that stage two of its solar panel project is underway, with installation expected to be completed by December 2022.
The second phase of the development, which aims to ensure a more sustainable future for Metrocentre, sees the installation of solar PV car ports and 46 new EV charging ports in the Green and Blue Mall car parks, following the recent installation of its new solar PV rooftop panels covering an area equivalent in...
+82% more
TransportXtra is part of Landor LINKS
© 2025 TransportXtra | Landor LINKS Ltd | All Rights Reserved
Subscriptions, Magazines & Online Access Enquires
[Frequently Asked Questions]
Email: subs.ltt@landor.co.uk | Tel: +44 (0) 20 7091 7959
Shop & Accounts Enquires
Email: accounts@landor.co.uk | Tel: +44 (0) 20 7091 7855
Advertising Sales & Recruitment Enquires
Email: daniel@landor.co.uk | Tel: +44 (0) 20 7091 7861
Events & Conference Enquires
Email: conferences@landor.co.uk | Tel: +44 (0) 20 7091 7865
Press Releases & Editorial Enquires
Email: info@transportxtra.com | Tel: +44 (0) 20 7091 7875
Privacy Policy | Terms and Conditions | Advertise
Web design london by Brainiac Media 2020