Local Transport Today is the authoritative, independent journal for transport decision makers. Analysis, Comment & News on Transport Policy, Planning, Finance and Delivery since 1989.

Work on Crossrail's Canary Wharf station moves forward

11 February 2010
Dock drainage is next phase in construction of biggest Crossrail station
Dock drainage is next phase in construction of biggest Crossrail station

 

Work at the Canary Wharf Crossrail station took a major step forward today as transport minister Sadiq Khan flicked the switch on pumps draining nearly 100 million litres - the equivalent to 40 Olympic swimming pools - from the worksite over the next six weeks.

The pumps will transfer water from inside the site's specially constructed coffer dam to the North Dock at a maximum rate of 13,500 litres per minute.

A station 'box' will then be constructed in a dry environment - a similar technique to...

+85% more

 

Healthy Streets Traffic Engineer Technical Lead x2
Bristol City Council
100 Temple Street Redcliffe Bristol BS1 6AN
BG13 £45,718 - £48,710
Senior Transport Planner
London Borough of Camden
5 Pancras Square, London, N1C 4AG
£44,579
Healthy Streets Senior Traffic Engineer
Bristol City Council
100 Temple Street Redcliffe Bristol BS1 6AN
£37,336 to £39,186
View all Vacancies
 
Search
 
 
 

TransportXtra is part of Landor LINKS

© 2024 TransportXtra | Landor LINKS Ltd | All Rights Reserved

Subscriptions, Magazines & Online Access Enquires
[Frequently Asked Questions]
Email: subs.ltt@landor.co.uk | Tel: +44 (0) 20 7091 7959

Shop & Accounts Enquires
Email: accounts@landor.co.uk | Tel: +44 (0) 20 7091 7855

Advertising Sales & Recruitment Enquires
Email: daniel@landor.co.uk | Tel: +44 (0) 20 7091 7861

Events & Conference Enquires
Email: conferences@landor.co.uk | Tel: +44 (0) 20 7091 7865

Press Releases & Editorial Enquires
Email: info@transportxtra.com | Tel: +44 (0) 20 7091 7875

Privacy Policy | Terms and Conditions | Advertise

Web design london by Brainiac Media 2020