The outturn cost of the new Forth road bridge and associated link roads is now £1.45bn-£1.6bn – significantly less than the previous £1.7bn-£2.3bn range, Transport Scotland has said. Project director David Climie said the main construction contract (£790m excluding VAT and inflation), the M9 junction 1a contract (£25.6m), and the Fife intelligent transport system contract (£12.9m), had all been cheaper than expected because of the economic...
+22% moreIncludes full online access to TransportXtra.com and searchable archive
Essential reading for public and private sector transport professionals in the UK and beyond
Stay ahead of the competition – hear it first
Written by leading experts in the transport industry
Additional publications throughout the year covering specific subjects Active Travel Directory, Loveable Neighbourhoods and Data and Modelling
Access to our webinar library
Full access to the 50,000 article archive
Tailored E-bulletins
TransportXtra is part of Landor LINKS
© 2025 TransportXtra | Landor LINKS Ltd | All Rights Reserved
Subscriptions, Magazines & Online Access Enquires
[Frequently Asked Questions]
Email: subs.ltt@landor.co.uk | Tel: +44 (0) 20 7091 7959
Shop & Accounts Enquires
Email: accounts@landor.co.uk | Tel: +44 (0) 20 7091 7855
Advertising Sales & Recruitment Enquires
Email: daniel@landor.co.uk | Tel: +44 (0) 20 7091 7861
Events & Conference Enquires
Email: conferences@landor.co.uk | Tel: +44 (0) 20 7091 7865
Press Releases & Editorial Enquires
Email: info@transportxtra.com | Tel: +44 (0) 20 7091 7875
Privacy Policy | Terms and Conditions | Advertise
Web design london by Brainiac Media 2020