Electric trains between South Wales and London began operating last weekend, although Network Rail is still unable to energise the power equipment through the Severn Tunnel that it installed in 2016.
Network Rail commissioned overhead line equipment in the Cardiff area over the Christmas and New Year period, having previously energised the main line east of the Severn Tunnel. This enabled the launch of the first ever electric service on the Welsh rail network, excluding historic tramways and...
+55% moreIncludes full online access to TransportXtra.com and searchable archive
Essential reading for public and private sector transport professionals in the UK and beyond
Stay ahead of the competition – hear it first
Written by leading experts in the transport industry
Additional publications throughout the year covering specific subjects Active Travel Directory, Loveable Neighbourhoods and Data and Modelling
Access to our webinar library
Full access to the 50,000 article archive
Tailored E-bulletins
TransportXtra is part of Landor LINKS
© 2024 TransportXtra | Landor LINKS Ltd | All Rights Reserved
Subscriptions, Magazines & Online Access Enquires
[Frequently Asked Questions]
Email: subs.ltt@landor.co.uk | Tel: +44 (0) 20 7091 7959
Shop & Accounts Enquires
Email: accounts@landor.co.uk | Tel: +44 (0) 20 7091 7855
Advertising Sales & Recruitment Enquires
Email: daniel@landor.co.uk | Tel: +44 (0) 20 7091 7861
Events & Conference Enquires
Email: conferences@landor.co.uk | Tel: +44 (0) 20 7091 7865
Press Releases & Editorial Enquires
Email: info@transportxtra.com | Tel: +44 (0) 20 7091 7875
Privacy Policy | Terms and Conditions | Advertise
Web design london by Brainiac Media 2020