Network Rail has appointed consultant Jacobs to provide design services for the Edinburgh Waverley Western Approaches project, which is exploring three ways of increasing rail capacity. Each option involves building the Almond chord, a piece of track that would allow trains to/from the Falkirk lines to join the Edinburgh-Fife lines south of Dalmeny. The variations between the three options are: flat junctions at both Winchburgh and Almond; a flat Winchburgh Junction and a grade separated Almond Junction; grade separated junctions at both Winchburgh and Almond.
TransportXtra is part of Landor LINKS
© 2025 TransportXtra | Landor LINKS Ltd | All Rights Reserved
Subscriptions, Magazines & Online Access Enquires
[Frequently Asked Questions]
Email: subs.ltt@landor.co.uk | Tel: +44 (0) 20 7091 7959
Shop & Accounts Enquires
Email: accounts@landor.co.uk | Tel: +44 (0) 20 7091 7855
Advertising Sales & Recruitment Enquires
Email: daniel@landor.co.uk | Tel: +44 (0) 20 7091 7861
Events & Conference Enquires
Email: conferences@landor.co.uk | Tel: +44 (0) 20 7091 7865
Press Releases & Editorial Enquires
Email: info@transportxtra.com | Tel: +44 (0) 20 7091 7875
Privacy Policy | Terms and Conditions | Advertise
Web design london by Brainiac Media 2020