Campaigners for the full dualling of the A47 between the A1 and Great Yarmouth/Lowestoft are “re-evaluating” their strategy after their cherished schemes were omitted from the Govermment’s Road Investment Strategy 2 programme for the next five years (2020/21-2024/25). Highways England is committed to delivering six A47 schemes during RIS2. They should have commenced delivery in RIS1. The A47 Alliance had lobbied for the inclusion of three more dualling projects in RIS2: the Acle Straight in Norfolk; Tilney to East Winch (including Hardwick flyover) in Norfolk; and between Peterborough and Wisbech in Cambridgeshire.
TransportXtra is part of Landor LINKS
© 2024 TransportXtra | Landor LINKS Ltd | All Rights Reserved
Subscriptions, Magazines & Online Access Enquires
[Frequently Asked Questions]
Email: subs.ltt@landor.co.uk | Tel: +44 (0) 20 7091 7959
Shop & Accounts Enquires
Email: accounts@landor.co.uk | Tel: +44 (0) 20 7091 7855
Advertising Sales & Recruitment Enquires
Email: daniel@landor.co.uk | Tel: +44 (0) 20 7091 7861
Events & Conference Enquires
Email: conferences@landor.co.uk | Tel: +44 (0) 20 7091 7865
Press Releases & Editorial Enquires
Email: info@transportxtra.com | Tel: +44 (0) 20 7091 7875
Privacy Policy | Terms and Conditions | Advertise
Web design london by Brainiac Media 2020