Construction of the Winchester Superhub has passed a major milestone with the arrival of its Battery Energy Storage System (BESS) units and the installation of 870 solar panel modules.
The site’s operator, InstaVolt, has made a commitment to delivering reliable, ultra-rapid, and 100% renewable electric vehicle charging.
The on-site solar panels can generate up to 500kW of renewable energy, while the two BESS units provide a total storage capacity of 960kW/4MWh.
Smart energy management...
+56% more
TransportXtra is part of Landor LINKS
© 2025 TransportXtra | Landor LINKS Ltd | All Rights Reserved
Subscriptions, Magazines & Online Access Enquires
[Frequently Asked Questions]
Email: subs.ltt@landor.co.uk | Tel: +44 (0) 20 7091 7959
Shop & Accounts Enquires
Email: accounts@landor.co.uk | Tel: +44 (0) 20 7091 7855
Advertising Sales & Recruitment Enquires
Email: daniel@landor.co.uk | Tel: +44 (0) 20 7091 7861
Events & Conference Enquires
Email: conferences@landor.co.uk | Tel: +44 (0) 20 7091 7865
Press Releases & Editorial Enquires
Email: info@transportxtra.com | Tel: +44 (0) 20 7091 7875
Privacy Policy | Terms and Conditions | Advertise
Web design london by Brainiac Media 2020