Network Rail faces a £3m penalty after it breached its licence for failing to run an effective and efficient timetabling process for Britain’s rail network, the Office of Rail Regulation announced today.
The proposed financial penalty follows confirmation in September 2010 that Network Rail had breached its licence after problems arose from the introduction of the Integrated Train Planning System for the May 2010 timetable.
System faults left some operators temporarily unable to...
+84% more
TransportXtra is part of Landor LINKS
© 2024 TransportXtra | Landor LINKS Ltd | All Rights Reserved
Subscriptions, Magazines & Online Access Enquires
[Frequently Asked Questions]
Email: subs.ltt@landor.co.uk | Tel: +44 (0) 20 7091 7959
Shop & Accounts Enquires
Email: accounts@landor.co.uk | Tel: +44 (0) 20 7091 7855
Advertising Sales & Recruitment Enquires
Email: daniel@landor.co.uk | Tel: +44 (0) 20 7091 7861
Events & Conference Enquires
Email: conferences@landor.co.uk | Tel: +44 (0) 20 7091 7865
Press Releases & Editorial Enquires
Email: info@transportxtra.com | Tel: +44 (0) 20 7091 7875
Privacy Policy | Terms and Conditions | Advertise
Web design london by Brainiac Media 2020