Network Rail results reveals significant savings

25 November 2010
 

Network Rail today announced its interim results for the six months to September 30. The company has reported better than planned progress across its business with big capacity enhancing schemes going well, train punctuality remaining at high levels and real cost reductions of almost £200m made in the period.

These cost reductions will have grown to around £400m of savings by year end and the company acknowledges that there is still a long way to go to make the railway more...

+91% more

 

PROGRAMME LEAD – TRANSPORT APPRAISAL
Cumberland Council

£49,764 – £50,788
Principal Transport Strategy Officer
Tameside
Tameside One, Ashton-under-Lyne
Grade J. SCP 40 - £49,764 to SCP 43 - £52,805 with a professional bar at SCP 41 £50,788**
Service Director: Transport and Connectivity
Cambridgeshire County Council
Alconbury, Cambridgeshire
L2: £102,329 - £114,988
View all Vacancies
 
Search
 
 
 

TransportXtra is part of Landor LINKS

© 2024 TransportXtra | Landor LINKS Ltd | All Rights Reserved

Subscriptions, Magazines & Online Access Enquires
[Frequently Asked Questions]
Email: subs.ltt@landor.co.uk | Tel: +44 (0) 20 7091 7959

Shop & Accounts Enquires
Email: accounts@landor.co.uk | Tel: +44 (0) 20 7091 7855

Advertising Sales & Recruitment Enquires
Email: daniel@landor.co.uk | Tel: +44 (0) 20 7091 7861

Events & Conference Enquires
Email: conferences@landor.co.uk | Tel: +44 (0) 20 7091 7865

Press Releases & Editorial Enquires
Email: info@transportxtra.com | Tel: +44 (0) 20 7091 7875

Privacy Policy | Terms and Conditions | Advertise

Web design london by Brainiac Media 2020