Frustration at slow progress on high speed rail

At a recent industry conference to promote a high speed line from London to the West Midlands Chris Randall discovered a growing mood of unrest

04 July 2008
‘Rail has earned the right to build HS2’
Richard Brown
Eurostar
‘Rail has earned the right to build HS2’ Richard Brown Eurostar

 

“We have got to start planning now.” The message from conference chairman Chris Green couldn’t have been clearer. He had barely finished telling delegates where they could find the fire exits before launching headlong into the theme of the day: building a high speed railway can take 20 years or more from drawing board to track, so there’s no time to waste.

Green, a fabled innovator during a long and illustrious career with British Rail and Virgin Trains, is a...

+92% more

 

Senior Transport Planner (Euston, HS2 and KX)
Camden Council
5 Pancras Square, London, N1C 4AG
£44,579
Healthy Streets Senior Traffic Engineer
Bristol City Council
100 Temple Street Redcliffe Bristol BS1 6AN
£37,336 to £39,186
Senior Engineer (Streetspace Team)
London Borough of Haringey
Alexandra House, England
PO4 £47,532 – £50,574 per annum
View all Vacancies
 
Search
 
 
 

TransportXtra is part of Landor LINKS

© 2024 TransportXtra | Landor LINKS Ltd | All Rights Reserved

Subscriptions, Magazines & Online Access Enquires
[Frequently Asked Questions]
Email: subs.ltt@landor.co.uk | Tel: +44 (0) 20 7091 7959

Shop & Accounts Enquires
Email: accounts@landor.co.uk | Tel: +44 (0) 20 7091 7855

Advertising Sales & Recruitment Enquires
Email: daniel@landor.co.uk | Tel: +44 (0) 20 7091 7861

Events & Conference Enquires
Email: conferences@landor.co.uk | Tel: +44 (0) 20 7091 7865

Press Releases & Editorial Enquires
Email: info@transportxtra.com | Tel: +44 (0) 20 7091 7875

Privacy Policy | Terms and Conditions | Advertise

Web design london by Brainiac Media 2020