Investigations reveal further faults on Cambs guided busway

GUIDED BUS

Andrew Forster
17 April 2014
Busway: bearing problems
Busway: bearing problems

 

A new row is brewing in Cambridgeshire between the county council and its guided busway contractor BAM Nuttall, following the discovery of further serious problems with the busway structure. 

The 16-mile busway between Addenbrooke’s hospital in south Cambridge and St Ives, north-west of the city, opened in summer 2011, more than two-and-a-half-years late. In January this year BAM Nuttall re-paid the council £33m in a settlement covering the delays and the costs of correcting...

+89% more

 

Healthy Streets Traffic Engineer Technical Lead x2
Bristol City Council
100 Temple Street Redcliffe Bristol BS1 6AN
BG13 £45,718 - £48,710
Senior Transport Planner
London Borough of Camden
5 Pancras Square, London, N1C 4AG
£44,579
Healthy Streets Senior Traffic Engineer
Bristol City Council
100 Temple Street Redcliffe Bristol BS1 6AN
£37,336 to £39,186
View all Vacancies
 
Search
 
 
 

TransportXtra is part of Landor LINKS

© 2024 TransportXtra | Landor LINKS Ltd | All Rights Reserved

Subscriptions, Magazines & Online Access Enquires
[Frequently Asked Questions]
Email: subs.ltt@landor.co.uk | Tel: +44 (0) 20 7091 7959

Shop & Accounts Enquires
Email: accounts@landor.co.uk | Tel: +44 (0) 20 7091 7855

Advertising Sales & Recruitment Enquires
Email: daniel@landor.co.uk | Tel: +44 (0) 20 7091 7861

Events & Conference Enquires
Email: conferences@landor.co.uk | Tel: +44 (0) 20 7091 7865

Press Releases & Editorial Enquires
Email: info@transportxtra.com | Tel: +44 (0) 20 7091 7875

Privacy Policy | Terms and Conditions | Advertise

Web design london by Brainiac Media 2020