Temporary bridge for Hammersmith

23 March 2020
 

Transport for London plans to build a temporary walking and cycling bridge across the Thames at Hammersmith to speed up repairs to the Hammersmith Bridge. The Hammersmith Bridge had handled 22,000 vehicles a day but has been restricted to pedestrians and cyclists only since April last year after microfractures were discovered in its cast iron pedestals. The temporary prefabricated steel bridge would cater for the 16,000 pedestrians and cyclists who currently cross the river here. TfL has engaged with residents about the crossing and intends to submit a planning applicatio to Hammersmith & Fulham and Richmond councils. Construction of the bridge could start this summer with opening this winter. TfL has committed £25m to the cost of restoring the existing bridge and building the temporary structure. Hammersmith & Fulham and TfL have submitted a bid to the DfT to fund the full restoration of the bridge. The costs last autumn were reported as £120m (LTT 25 Oct 19).

Transport Services Manager
Rutland County Council
Rutland
£54,976 - £58,977
Transport Services Manager
Rutland County Council
Rutland
£54,976 - £58,977
Transport Services Manager
Rutland County Council
Rutland
£54,976 - £58,977
View all Vacancies
 
Search
 
 
 

TransportXtra is part of Landor LINKS

© 2024 TransportXtra | Landor LINKS Ltd | All Rights Reserved

Subscriptions, Magazines & Online Access Enquires
[Frequently Asked Questions]
Email: subs.ltt@landor.co.uk | Tel: +44 (0) 20 7091 7959

Shop & Accounts Enquires
Email: accounts@landor.co.uk | Tel: +44 (0) 20 7091 7855

Advertising Sales & Recruitment Enquires
Email: daniel@landor.co.uk | Tel: +44 (0) 20 7091 7861

Events & Conference Enquires
Email: conferences@landor.co.uk | Tel: +44 (0) 20 7091 7865

Press Releases & Editorial Enquires
Email: info@transportxtra.com | Tel: +44 (0) 20 7091 7875

Privacy Policy | Terms and Conditions | Advertise

Web design london by Brainiac Media 2020