Brighton & Hove City Council is consulting on the third phase of works to remodel Valley Gardens. The £7.8m phase three covers the Old Steine to Palace Pier area and features changes to the traffic layout on the A23 on the eastern side of Old Steine; new areas of public space; traffic signals at the A23/A259 Palace Pier junction on the seafront replacing the current roundabout; and a two-way cycle route to the west of the Old Steine. Consultation closes on 16 September. Construction could start in spring 2021 and be completed in autumn 2022. Visit: https://tinyurl.com/yx8pd29n
TransportXtra is part of Landor LINKS
© 2024 TransportXtra | Landor LINKS Ltd | All Rights Reserved
Subscriptions, Magazines & Online Access Enquires
[Frequently Asked Questions]
Email: subs.ltt@landor.co.uk | Tel: +44 (0) 20 7091 7959
Shop & Accounts Enquires
Email: accounts@landor.co.uk | Tel: +44 (0) 20 7091 7855
Advertising Sales & Recruitment Enquires
Email: daniel@landor.co.uk | Tel: +44 (0) 20 7091 7861
Events & Conference Enquires
Email: conferences@landor.co.uk | Tel: +44 (0) 20 7091 7865
Press Releases & Editorial Enquires
Email: info@transportxtra.com | Tel: +44 (0) 20 7091 7875
Privacy Policy | Terms and Conditions | Advertise
Web design london by Brainiac Media 2020