Electric Freightway to benefit from GRIDSERVE EV charging test lab

Mark Moran
10 July 2024
The GRIDSERVE Innovation and Operations Centre in Swindon

 

Chargepoint operator GRIDSERVE has opened a dedicated electric vehicle charging test to support the Electric Freightway programme in developing a charging network for electric trucks.

Based at the GRIDSERVE Innovation and Operations Centre in Swindon, the in-house facility features a mix of High Power and Medium Power EV chargers, with future capacity to test megawatt-capable (MW) charging.

The facility has also been designed to securely test the so-called charging handshake with pre-production...

+81% more

 

Head of Parking Services
Royal Borough of Greenwich
Greenwich + remote working opportunities
£79,446 - £84,393
Principal Transportation and Infrastructure Planner
Essex County Council
Working Style: Work from anywhere
£54,889 to £64,576
Head of Programmes and Public Realm
Royal Borough of Greenwich
Greenwich + Remote working opportunities
£79,446 - £84,393
View all Vacancies
 
Search
 
 
 

TransportXtra is part of Landor LINKS

© 2024 TransportXtra | Landor LINKS Ltd | All Rights Reserved

Subscriptions, Magazines & Online Access Enquires
[Frequently Asked Questions]
Email: subs.ltt@landor.co.uk | Tel: +44 (0) 20 7091 7959

Shop & Accounts Enquires
Email: accounts@landor.co.uk | Tel: +44 (0) 20 7091 7855

Advertising Sales & Recruitment Enquires
Email: daniel@landor.co.uk | Tel: +44 (0) 20 7091 7861

Events & Conference Enquires
Email: conferences@landor.co.uk | Tel: +44 (0) 20 7091 7865

Press Releases & Editorial Enquires
Email: info@transportxtra.com | Tel: +44 (0) 20 7091 7875

Privacy Policy | Terms and Conditions | Advertise

Web design london by Brainiac Media 2020