Alexander backs break-up of TPI road list in bid to control costs

15 March 2007
The Targeted Programme of Improvements will be replaced by three groupings of scheme
The Targeted Programme of Improvements will be replaced by three groupings of scheme

 

Transport secretary Douglas Alexander this week announced that the Highways Agency's £12bn Targeted Programme of Improvements - the road programme - is to be broken up in the light of two damning reports on road scheme costs.

A 100-page report by Mike Nichols, chairman of consultant the Nichols Group, identifies a catalogue of weaknesses with the way that the HA's road programme is currently managed. Meanwhile, the National Audit Office reports that schemes currently in the TPI will end...

+91% more

 

Healthy Streets Senior Traffic Engineer
Bristol City Council
100 Temple Street Redcliffe Bristol BS1 6AN
£37,336 to £39,186
Healthy Streets Traffic Engineer Technical Lead x2
Bristol City Council
100 Temple Street Redcliffe Bristol BS1 6AN
BG13 £45,718 - £48,710
Healthy Streets Principal Traffic Engineer
Bristol City Council
100 Temple Street Redcliffe Bristol BS1 6AN
£38,296 to £ £43,421 (Career Grade BG12)
View all Vacancies
 
Search
 
 
 

TransportXtra is part of Landor LINKS

© 2024 TransportXtra | Landor LINKS Ltd | All Rights Reserved

Subscriptions, Magazines & Online Access Enquires
[Frequently Asked Questions]
Email: subs.ltt@landor.co.uk | Tel: +44 (0) 20 7091 7959

Shop & Accounts Enquires
Email: accounts@landor.co.uk | Tel: +44 (0) 20 7091 7855

Advertising Sales & Recruitment Enquires
Email: daniel@landor.co.uk | Tel: +44 (0) 20 7091 7861

Events & Conference Enquires
Email: conferences@landor.co.uk | Tel: +44 (0) 20 7091 7865

Press Releases & Editorial Enquires
Email: info@transportxtra.com | Tel: +44 (0) 20 7091 7875

Privacy Policy | Terms and Conditions | Advertise

Web design london by Brainiac Media 2020