Monthly journal Parking Review has been the definitive source of news and intelligence on the UK and international public and private parking sectors since 1989.

Alternative routes: high cost, fewer benefits

20 January 2012
This rusty railway could have a vital part to play in the construction of the London-West Midlands high-speed route. In November, the Chancellor announced the Government support for the East West Rail Consortium plan to re-establish the Oxford-Bedford link, a project that involves improving existing rail lines as well as relaying the track between Calvert in Buckinghamshire and Bletchley (pictured). The line, which could re-open in 2017, crosses the high-speed railway alignment at Calvert, where HS2 Ltd plans to build an infrastructure maintenance depot. East West Rail is likely to be a supply route for materials needed for HS2’s construction.
This rusty railway could have a vital part to play in the construction of the London-West Midlands high-speed route. In November, the Chancellor announced the Government support for the East West Rail Consortium plan to re-establish the Oxford-Bedford link, a project that involves improving existing rail lines as well as relaying the track between Calvert in Buckinghamshire and Bletchley (pictured). The line, which could re-open in 2017, crosses the high-speed railway alignment at Calvert, where HS2 Ltd plans to build an infrastructure maintenance depot. East West Rail is likely to be a supply route for materials needed for HS2’s construction.

 

None of the alternative alignments suggested for a London-West Midlands high-speed rail line can deliver comparable benefits to the preferred route through the Chilterns Area of Outstanding Natural Beauty (AONB), says the Government.

Planning Policy Statement 7: Sustainable development in rural areas states that major development should only take place in AONB’s in exceptional circumstances.

“Our conclusion is that alternative routes for a high-speed rail line that avoids the AONB...

+77% more

 

Principal Transport Strategy Officer
Buckinghamshire Council
Aylesbury (Remote working available)
£55,683 - £58,540
Head of Service Sustainable Transport and Mobility
Stockport Metropolitan Borough Council

Up to £71,574 (pay award pending)
Principal Transport Strategy Officer
Buckinghamshire Council
Aylesbury (Remote working available)
£55,683 - £58,540
View all Vacancies
 
Search
 
 
 

TransportXtra is part of Landor LINKS

© 2024 TransportXtra | Landor LINKS Ltd | All Rights Reserved

Subscriptions, Magazines & Online Access Enquires
[Frequently Asked Questions]
Email: subs.ltt@landor.co.uk | Tel: +44 (0) 20 7091 7959

Shop & Accounts Enquires
Email: accounts@landor.co.uk | Tel: +44 (0) 20 7091 7855

Advertising Sales & Recruitment Enquires
Email: daniel@landor.co.uk | Tel: +44 (0) 20 7091 7861

Events & Conference Enquires
Email: conferences@landor.co.uk | Tel: +44 (0) 20 7091 7865

Press Releases & Editorial Enquires
Email: info@transportxtra.com | Tel: +44 (0) 20 7091 7875

Privacy Policy | Terms and Conditions | Advertise

Web design london by Brainiac Media 2020