Monthly journal Parking Review has been the definitive source of news and intelligence on the UK and international public and private parking sectors since 1989.

Network Rail launches task forces in wake of Stonehaven tragedy

Mark Moran
27 August 2020
Rail line flooded near the Drax power station in North Yorkshire
Rail line flooded near the Drax power station in North Yorkshire
 

Network Rail has launched two independent task forces to help it better manage its cuttings and embankments portfolio, and improve its understanding and response to severe weather events.

The task forces a response to a derailment near Stonehaven in Scotland on 12 August. This led to driver Brett McCullough, conductor Donald Dinnie and passenger Christopher Stuchbury losing their lives.

Dame Julia Slingo FRS, former chief scientist at the Met Office and an expert in climatology, will lead a weather action task force with the objective of better equipping Network Rail to understand the risk of rainfall to its infrastructure, drawing on the latest scientific developments in monitoring, real-time observations and weather forecasting.

Meanwhile, Lord Robert Mair CBE will spearhead an earthworks management task force to see how Network Rail can improve the management of its cuttings an embankments portfolio. This task force will look at past incidents, new technologies and innovations, and best practice from across the globe.

Network Rail owns and operates 20,000 miles of track, 30,000 bridges, tunnels and viaducts. It runs 20 of the UK's largest stations directly, while 2,500 more stations are run by train operating companies.

Network Rail said its current safety management system provides a framework for the management of cuttings, embankments, structures and drainage. The company said this has helped limit the effects of rainfall on its infrastructure, but the events at Stonehaven on 12 August have shown that more understanding is needed to help mitigate the risks further.

Andrew Haines, Network Rail chief executive, said: “The Stonehaven tragedy resulted in three people losing their lives. This is a stark reminder that we must never take running a safe railway for granted.

“With more and more extreme weather and tens of thousands of earthwork assets across Great Britain, our challenge is massive. And while we are making record investment in these areas, we have asked world renowned experts, Dame Julia Slingo and Lord Mair, to help us address these issues as effectively as possible, and at pace.”

Transport Secretary Grant Shapps said: “The incident at Stonehaven was an absolute tragedy and we must make sure we learn every possible lesson to ensure it is never repeated. I welcome these taskforces as a step towards understanding the issues involved and have also asked Network Rail for a wider assessment of the impact of poor weather on Britain’s network, with an interim report published in early September.”

Weather action task force
Dame Julia Slingo FRS, meteorologist and former chief scientist at the UK Met Office, will lead a review of Network Rail’s capability to manage and understand the effects of heavy rainfall on the railway. Her task force will look at:

  • How the data and research collected by Network Rail could be used to understand likely levels of rainfall at a location level in the present and 10 years in the future, in order to estimate potential damage to infrastructure
  • How data can be used to ensure future engineering decisions take local weather factors into account, and to better understand how changing land use or river management policies near the railway affect how quickly rain enters and leaves the system
  • The effectiveness of Network Rail’s use of existing forecasting and weather monitoring technology to identify where rainfall could pose a risk to the railway, and how that might be improved – for example through 'nowcasting'
  • The extent to which Network Rail has explored the potential of real-time weather monitoring technology
  • How Network Rail might use the weather expertise available to provide input into longer-term planning and procurement decisions – for example earthworks engineering, or providing guidance to track and rolling stock design specifications.

Earthworks management task force
Network Rail’s investment in its earthworks and drainage portfolio has increase significantly in recent years with its spend in 2009 to 2014 of £550m, increasing to £952m from 2014 to 2019, and with a budget of £1.3bn from 2019 to 2024.
Lord Robert Mair CBE FREng FRS is a geotechnical engineer and member of the House of Lords Select Committee on Science and Technology. His task force will look at Network Rail’s management of its earthworks – including high-risk assets such as cuttings and embankments. The work will cover:

  • The effectiveness of Network Rail’s existing approach to managing drainage and earthworks assets, and whether or not a more integrated, co-ordinated approach is required
  • An independent view of the suitability of our controls framework – whether it is effective in controlling risks and whether it is too onerous for frontline engineers
  • Whether Network Rail has sufficient resources and skills to manage earthworks and drainage, and whether certain teams or regions could be strengthened
  • What Network Rail might learn from other organisations with responsibility for managing earthwork risks
  • Whether Network Rail is fully aware of the latest technologies and whether or not they are deployed effectively.

Immediately after the incident on 12 August, Network Rail introduced a range of additional safety measures, including:

  • As an immediate precaution, hundreds of sites nationwide with higher-risk trackside slopes, similar to Stonehaven, were inspected. These were carried out by both in-house engineers and specialist contractors, supplemented by helicopter surveys
  • In the light of the current extreme weather conditions Network Rail mobilised its extreme weather action teams and instructed them to incorporate immediate learning into their plans as soon as it becomes available
  • Discussions with meteorologists to understand how Network Rail can strengthen real-time information for flash flooding caused by unpredictable extreme weather to inform train operations, in cooperation with Network Rail's industry partners
  • Network Rail engineers continue to review the existing programme for remote monitoring of high-risk sites to test whether this can go faster or further.
Senior Transport Planner
London Borough of Camden
5 Pancras Square, London, N1C 4AG
£44,579
Healthy Streets Principal Traffic Engineer
Bristol City Council
100 Temple Street Redcliffe Bristol BS1 6AN
£38,296 to £ £43,421 (Career Grade BG12)
Healthy Streets Traffic Engineer Technical Lead x2
Bristol City Council
100 Temple Street Redcliffe Bristol BS1 6AN
BG13 £45,718 - £48,710
View all Vacancies
 
Search
 
 
 

TransportXtra is part of Landor LINKS

© 2024 TransportXtra | Landor LINKS Ltd | All Rights Reserved

Subscriptions, Magazines & Online Access Enquires
[Frequently Asked Questions]
Email: subs.ltt@landor.co.uk | Tel: +44 (0) 20 7091 7959

Shop & Accounts Enquires
Email: accounts@landor.co.uk | Tel: +44 (0) 20 7091 7855

Advertising Sales & Recruitment Enquires
Email: daniel@landor.co.uk | Tel: +44 (0) 20 7091 7861

Events & Conference Enquires
Email: conferences@landor.co.uk | Tel: +44 (0) 20 7091 7865

Press Releases & Editorial Enquires
Email: info@transportxtra.com | Tel: +44 (0) 20 7091 7875

Privacy Policy | Terms and Conditions | Advertise

Web design london by Brainiac Media 2020