The moveable concrete barrier deployed by Highways England on the M20 in Kent under Operation Brock will be deactivated this weekend.
The barrier will be removed overnight on Saturday 31 July, a move that will see the M20 return to three full width lanes at the national speed limit in both directions.
The barrier was put in place on a 15-mile section of the M20 between junctions 8 (Maidstone) and 9 (Ashford) on 17 July as a precautionary measure in anticipation of increased...
+65% more
TransportXtra is part of Landor LINKS
© 2025 TransportXtra | Landor LINKS Ltd | All Rights Reserved
Subscriptions, Magazines & Online Access Enquires
[Frequently Asked Questions]
Email: subs.ltt@landor.co.uk | Tel: +44 (0) 20 7091 7959
Shop & Accounts Enquires
Email: accounts@landor.co.uk | Tel: +44 (0) 20 7091 7855
Advertising Sales & Recruitment Enquires
Email: daniel@landor.co.uk | Tel: +44 (0) 20 7091 7861
Events & Conference Enquires
Email: conferences@landor.co.uk | Tel: +44 (0) 20 7091 7865
Press Releases & Editorial Enquires
Email: info@transportxtra.com | Tel: +44 (0) 20 7091 7875
Privacy Policy | Terms and Conditions | Advertise
Web design london by Brainiac Media 2020