Transit
Widely read by rail, light rail and bus operators, local and central governments, the city, consultants and suppliers, New Transit delivered comprehensive passenger transport news and comment.
TRANSIT CEASED PUBLICATION IN JUNE 2010

Alternative routes: high cost, fewer benefits

20 January 2012
This rusty railway could have a vital part to play in the construction of the London-West Midlands high-speed route. In November, the Chancellor announced the Government support for the East West Rail Consortium plan to re-establish the Oxford-Bedford link, a project that involves improving existing rail lines as well as relaying the track between Calvert in Buckinghamshire and Bletchley (pictured). The line, which could re-open in 2017, crosses the high-speed railway alignment at Calvert, where HS2 Ltd plans to build an infrastructure maintenance depot. East West Rail is likely to be a supply route for materials needed for HS2’s construction.
This rusty railway could have a vital part to play in the construction of the London-West Midlands high-speed route. In November, the Chancellor announced the Government support for the East West Rail Consortium plan to re-establish the Oxford-Bedford link, a project that involves improving existing rail lines as well as relaying the track between Calvert in Buckinghamshire and Bletchley (pictured). The line, which could re-open in 2017, crosses the high-speed railway alignment at Calvert, where HS2 Ltd plans to build an infrastructure maintenance depot. East West Rail is likely to be a supply route for materials needed for HS2’s construction.

 

None of the alternative alignments suggested for a London-West Midlands high-speed rail line can deliver comparable benefits to the preferred route through the Chilterns Area of Outstanding Natural Beauty (AONB), says the Government.

Planning Policy Statement 7: Sustainable development in rural areas states that major development should only take place in AONB’s in exceptional circumstances.

“Our conclusion is that alternative routes for a high-speed rail line that avoids the AONB...

+77% more

 

Principal Transport Strategy Officer
Buckinghamshire Council
Aylesbury (Remote working available)
£55,683 - £58,540
Head of Service Sustainable Transport and Mobility
Stockport Metropolitan Borough Council

Up to £71,574 (pay award pending)
Head of Service Sustainable Transport and Mobility
Stockport Metropolitan Borough Council

Up to £71,574 (pay award pending)
View all Vacancies
 
Search
 
 
 

TransportXtra is part of Landor LINKS

© 2024 TransportXtra | Landor LINKS Ltd | All Rights Reserved

Subscriptions, Magazines & Online Access Enquires
[Frequently Asked Questions]
Email: subs.ltt@landor.co.uk | Tel: +44 (0) 20 7091 7959

Shop & Accounts Enquires
Email: accounts@landor.co.uk | Tel: +44 (0) 20 7091 7855

Advertising Sales & Recruitment Enquires
Email: daniel@landor.co.uk | Tel: +44 (0) 20 7091 7861

Events & Conference Enquires
Email: conferences@landor.co.uk | Tel: +44 (0) 20 7091 7865

Press Releases & Editorial Enquires
Email: info@transportxtra.com | Tel: +44 (0) 20 7091 7875

Privacy Policy | Terms and Conditions | Advertise

Web design london by Brainiac Media 2020