DfT questions closure of Hammersmith Bridge

Infrastructure

Mark Moran
16 December 2020
Hammersmith Bridge. 
PIC: John Cameron
Hammersmith Bridge. PIC: John Cameron

 

The London Borough of Hammersmith and Fulham is being asked to reconsider its full closure of Hammersmith Bridge by the DfT. The Victorian bridge has been closed since August after existing cracks in the cast iron structure worsened during the summer heatwave.

The prospect of a limited reopening of the bridge to pedestrians, cyclists and river traffic has been raised by engineering reports commissioned by the government.

In September, the DfT asked engineering consultants AECOM and Professor...

+79% more

 

Healthy Streets Traffic Engineer Technical Lead x2
Bristol City Council
100 Temple Street Redcliffe Bristol BS1 6AN
BG13 £45,718 - £48,710
Healthy Streets Principal Traffic Engineer
Bristol City Council
100 Temple Street Redcliffe Bristol BS1 6AN
£38,296 to £ £43,421 (Career Grade BG12)
Healthy Streets Senior Traffic Engineer
Bristol City Council
100 Temple Street Redcliffe Bristol BS1 6AN
£37,336 to £39,186
View all Vacancies
 
Search
 
 
 

TransportXtra is part of Landor LINKS

© 2024 TransportXtra | Landor LINKS Ltd | All Rights Reserved

Subscriptions, Magazines & Online Access Enquires
[Frequently Asked Questions]
Email: subs.ltt@landor.co.uk | Tel: +44 (0) 20 7091 7959

Shop & Accounts Enquires
Email: accounts@landor.co.uk | Tel: +44 (0) 20 7091 7855

Advertising Sales & Recruitment Enquires
Email: daniel@landor.co.uk | Tel: +44 (0) 20 7091 7861

Events & Conference Enquires
Email: conferences@landor.co.uk | Tel: +44 (0) 20 7091 7865

Press Releases & Editorial Enquires
Email: info@transportxtra.com | Tel: +44 (0) 20 7091 7875

Privacy Policy | Terms and Conditions | Advertise

Web design london by Brainiac Media 2020