Study to examine case for re-opening Armagh line

Rail

Rhodri Clark
05 October 2021
Nichola Mallon: Developing a draft to set out future investment and improvment to strategic transport networks by 2035
Nichola Mallon: Developing a draft to set out future investment and improvment to strategic transport networks by 2035

 

A feasibility study is to be conducted on reopening the railway between Armagh and the Belfast to Dublin main line at Portadown. The 10-mile Armagh line closed in the 1950s but much of its trackbed still exists.

The local authority – Armagh City, Banbridge and Craigavon Borough Council – will contribute £10,000 to match £50,000 from the Department for Infrastructure for the feasibility study, which follows on from a scoping study.

Olga Murtagh, the council’s...

+79% more

 

Deputy Team Leader - Transport Planning
London Borough of Havering
Town Hall, Romford, Essex, RM1 3BB, GB
Grade 9 £51,093 - £55,155 pa
Deputy Team Leader - Transport Planning
London Borough of Havering
Town Hall, Romford, Essex, RM1 3BB, GB
Grade 9 £51,093 - £55,155 pa
Deputy Team Leader - Transport Planning
London Borough of Havering
Town Hall, Romford, Essex, RM1 3BB, GB
Grade 9 £51,093 - £55,155 pa
View all Vacancies
 
Search
 
 
 

TransportXtra is part of Landor LINKS

© 2024 TransportXtra | Landor LINKS Ltd | All Rights Reserved

Subscriptions, Magazines & Online Access Enquires
[Frequently Asked Questions]
Email: subs.ltt@landor.co.uk | Tel: +44 (0) 20 7091 7959

Shop & Accounts Enquires
Email: accounts@landor.co.uk | Tel: +44 (0) 20 7091 7855

Advertising Sales & Recruitment Enquires
Email: daniel@landor.co.uk | Tel: +44 (0) 20 7091 7861

Events & Conference Enquires
Email: conferences@landor.co.uk | Tel: +44 (0) 20 7091 7865

Press Releases & Editorial Enquires
Email: info@transportxtra.com | Tel: +44 (0) 20 7091 7875

Privacy Policy | Terms and Conditions | Advertise

Web design london by Brainiac Media 2020